Frame first, on the deck. Modular truss assembled at ground level for precise alignment. Initial 1m lift on a Genie Lift. At that height, the custom lining and stretch canvas were secured, the floating king poles installed. Final elevation. Truss raised to the 3m working height. Floor and fit-out. Suspended floor installed and carpeted. Lighting and side walls rigged to complete the enclosure.